Project

Dussafu SURF installation project – FPSO BW Adolo

Client

SBM Offshore

Main Client

BW Energy Gabon SA (BW Offshore)

Rana Scope of Work

  • 2 x 6” flexible flowline / PLEM tie-in
  • 2 x 6” Flexible jumpers tie-in on PLEM
  • 2 x 6” Flexible jumpers tie-in on Christmas-Trees

 

Project Data

Location

West Africa – Dussafu Field offshore Gabon

Dates

23/08/2018 to 12/09/2018

Diving techniques

Saturation diving

Duration

20 days

Resources

Vessel

DCSV SBM Installer

Diving Systems

In-built 12 man Saturation Diving System

ROV

Millennium Plus WROV

Personnel

Diving team: 24

Main Equipment

  • Lifting and installation aids
  • Hydraulic tools
  • Hydratight tensioners and HyTorc wrench